Construction of a clean room

The 9-week assembly of the 528m² ISO 8 clean room at GEMÜ Switzerland in fast motion. Thanks to the 16m long trusses, the air-conditioned Cleanroom is self-supporting over its entire length.
Pictures
Product information
%sge_quote%
%sge_quote_name%
 – 
%sge_name_position%
GEMÜ GmbH
Product: Cleanroom
Industry: Plastic processing
NeuesLogo_GEMU?_final_CMYK