Would you like to know how a simple cleanroom is set up? This video shows a fast-forwarded version of the two-week setup process for our modular system.
Wednesday morning in a production facility in Austria.
The floor is still covered with protective geotextile. A forklift is bringing prefabricated wall and ceiling panels into the hall. Individual components are stacked and ready for use.
Two weeks later, a certified ISO-7 cleanroom will be in place there.
That is exactly why we developed our modular system, which is designed for CNC Cleanrooms up to ISO Class 7.
For Anlagenbau Austria—a specialist in piping systems for ultra-pure and sterile media—we completed one of our largest projects of this type: two interconnected cleanrooms, each measuring 5.5 x 10.5 m. Twelve FFUs ensure the required cleanroom quality, while recessed ceiling lights provide uniform illumination. Qualification in accordance with ISO 7 was successfully completed.
The components arrived at the construction site pre-fabricated. A Schilling technician coordinated the installation, and the team from Anlagenbau Austria pitched in. The process was straightforward, solution-oriented, and collaborative.
Within just a few days, individual components were assembled into a ready-to-use cleanroom for the manufacturing, cleaning, and packaging of stainless steel piping components.
With an ISO-8 CNC cleanroom from SCHILLING ENGINEERING, you get a modular system that can be quickly set up and flexibly expanded. Simply send us a non-binding inquiry with some key details, or give us a call. We’d be happy to advise you!