Cleanroom project in record time

For our customer Hoerbiger Antriebstechnik Holding GmbH, we realized two modular cleanrooms of classes ISO 8 and ISO 9 in less than twelve weeks – from planning to handover ready for operation.

The ISO 9 area (42 m²) integrates a washing system with selective extraction via a filter fan unit (FFU). We increased the wall height in this segment to enable maintenance of the FFU from above.
The ISO 8 cleanroom (32 m²) is directly adjacent and enables the removal and vacuum packaging of washed parts. The cleanroom system is rounded off by a 15 m² personnel and material pass-trhough.

The self-supporting construction with varying wall heights, reinforced ceiling profiles and a glass control panel was efficiently prefabricated. A generous all-glass double door makes it easier to bring in machines and materials.

Thanks to modular construction, a high degree of prefabrication and close coordination with our customers, we were able to complete the assembly in record time and hand over the cleanrooms ready for operation on schedule.

Pictures
Product information
Modular rooms with a system and an appealing design - definitely an added value! Reliable project work with experience in detail! I can only recommend Schilling to others.
Norbert Ressle
 – 
Project Manager Industrial Engineering
HOERBIGER Antriebstechnik Holding GmbH
Product: Cleanroom
Industry: Automotive
Logo of the Hoerbiger company
More articles on this topic
An employee enters the material pass-trhough.
Knowledge
How do you bring materials safely into a cleanroom?
2.1.-F20_Reinraumzelt_Unisers-2
Case studies
3 Cleanroom tents for the semiconductor industry
290115_Comparison products cleanroom_with frame
Knowledge
Customized cleanroom: Which system suits your process?
Reading progress
×

Direct Product Inquiry