Video
Assembly of a cleanroom
The 9-week installation of the 528m² ISO 8 cleanroom at GEMÜ Switzerland in fast motion. The air-conditioned cleanroom is self-supporting over its entire length thanks to the 16m long trusses.
Video
The 9-week installation of the 528m² ISO 8 cleanroom at GEMÜ Switzerland in fast motion. The air-conditioned cleanroom is self-supporting over its entire length thanks to the 16m long trusses.