We rent out the cleanroom tents in the standard sizes 2x2m and 3x4m. A later takeover and settlement is possible.
https://schillingengineering.de/en/products/details/rental-tent
The cleanroom
Code of Conduct
The SCHILLING ENGINEERING Group stands for a reliable and trust-based corporate culture.
A fundamental requirement therefore is, that the SCHILLING ENGINEERING Group and all of its
General Terms and Conditions of Purchase
1. GENERAL
These general terms and conditions of purchase apply to all deliveries and services provided by the contractor to the Schilling Group (hereinafter
Clean air at Plansee
Plansee invests in 400 square meters of cleanroom with the latest technology
The Plansee Group, based in Reutte, Austria, specializes in the powder metallurgical
Laminar flow attachments
Enclosures for machines or laminar flow attachments for injection moulding machines specifically protect the production process from airborne contaminants such as viruses,
With our cleanroom chairs, cleanroom tables, stainless steel cabinets and stainless steel shelving, you can equip your cleanroom safely and functionally. The cleanroom furniture is tailored to the
A training course with practical exercises lasts approx. 4-5 hours, depending on the number of participants.
Participants do not need any previous knowledge to take part in our cleanroom training
When working in a cleanroom, cleanroom cleaning is an important issue. Cleanroom cleaning is a critical process that requires the utmost care and specifications to maintain cleanroom standards. The
We are fit for the future. Our family business is already in its second generation. So you can continue to count on us in the future and in the long term.
Safe laminar flow according to ISO 5
Soap and disinfectant dispensers for personnel locks. Depending on the locking regulations, hands are washed and/or disinfected before entering the cleanroom. The dispensers can be filled with hand